THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 07/22/2016. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S COMPLIANCE MONITORING PLAN SUMMARY SHEET, STAGE 2 DBPR IDSE VERY SMALL SYSTEM WAIVER AND MAP. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING AUGUST 2014/ AUGUST 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 DUAL SAMPLE AT SITE 01-A (CMS2DBP1) COLLECTED ANNUALLY DURING THE MONTH OF AUGUST.
IN 2015, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 DUAL SAMPLE AT SITE 01-A (CMS2DBP1) COLLECTED ANNUALLY DURING THE MONTH OF AUGUST.
STARTING IN 2016, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 DUAL TTHM SAMPLE COLLECTED ANNUALLY AT SITE 01-A IN AUGUST AND 1 DUAL HAA5 SAMPLE COLLECTED ANNUALLY AT SITE 02-A IN AUGUST.
THE NEXT SAMPLE WILL BE TAKEN IN AUGUST 2016.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A CMS2DBP1 DUAL (TTHM ONLY)
02-A CMS2DBP1 DUAL (HAA5 ONLY)
|