THE STAGE 2 REDUCED COMPLIANCE MONITORING PLAN SUMMARY SHEET WAS APPROVED ON 7/15/16. THE APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 DATA , 40/30, AND SUMMARY SHEET. STAGE 2 DATA SUBMITTED BEFORE THIS APPROVAL MET THE REQUIREMENTS OF THE RULE, AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATION (01-A AND 02-A), DURING THE MONTH OF JULY, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 1459 COLINA DR DUAL (TTHM & HAA5)
02-A 2274 MERRILL DUAL (TTHM & HAA5
|