THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 7/29/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) VERY SMALL SYSTEM WAIVER (GRANTED ON 11/21/07) AND STAGE 1 MONITORING SCHEDULE. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING JUNE 2014 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. STAGE 2 MONITORING SCHEDULE WILL BEGIN IN AUGUST 2016. BEGINNING 2017 AND MOVING FORWARD, THE STAGE 2 DBP SAMPLING MONTH FOR THIS SYSTEM WILL BE JULY, AS THAT IS THE HISTORIC MONTH OF HIGHEST DBP CONCENTRATION.
IN 2014-2015, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JUNE.
IN 2016, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 3390 KATHERINE MINE RD. DUAL (TTHM & HAA5)
BEGINNING IN 2017, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF JUNE.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 3390 KATHERINE MINE RD. DUAL (TTHM & HAA5)
|