THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET WAS APPROVED ON 8/10/16. THE APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 DATA , SUMMARY SHEET. STAGE 2 DATA COLLECTED IN 2014 PRIOR TO THIS APPROVAL MET THE REQUIREMENTS OF THE RULE, AND WILL BE CREDITED TO THE SYSTEM.
¿ IN 2014, STAGE 2 MONITORING CONSISTED OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JULY.
¿ IN 2015, NO SAMPLE WAS COLLECTED, THEREFORE, NO SCHEDULE EXISTED.
¿ IN 2016, STAGE 2 MONITORING CONSISTED OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
BEGINNING IN 2017, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JUNE, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 4921 PAYROLL AVE DUAL (TTHM & HAA5)
|