ADEQ - HOME SAFE DRINKING WATER WATER SYSTEM SEARCH


Water System Detail Information

Water System No.:

AZ0408003

Federal Type:

NP

Water System Name:

FORT MOJAVE TRIBAL UTILITY AUTHORITY

Primary Source:

GW

Principal County Served:

MOHAVE

System Status:

I

Comments:

Activity Date:

01-01-2023




Rule Analyte/Analyte Group Eff. Begin Eff. End App. Date For Comp.
DBP2 DBP2 - STAGE 2 DBP 10-01-2013 10-01-2013 Y
THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 9/2/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2008-2013, AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING 2013, 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. IN 2013, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST. SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A 9934 KINGMAN DUAL (TTHM & HAA5) 02-A 10721 FOUNTAIN COVE DUAL (TTHM & HAA5) IN 2014, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT THREE LOCATIONS (01-A, 02-A AND 03-A), DURING THE MONTH OF JUNE. IN 2015, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT THREE LOCATIONS (01-A, 02-A AND 03-A), DURING THE MONTH OF MAY. SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE 01-A 9934 KINGMAN DUAL (TTHM & HAA5) 02-A 10721 FOUNTAIN COVE DUAL (TTHM & HAA5) 03-A 9852 PHOENIX DUAL (TTHM & HAA5) IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF SEPTEMBER. BEGINNING IN 2017, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST. PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIAN


Sample Points
Point Facility Prim. Ind. Begin Date End Date Planned Sample Date/Tolerance
01-A DS001 Y 10-01-2013
02-A DS001 Y 10-01-2013
03-A DS001 Y 10-01-2013