OT |
SIG |
|
The system had a submersible pump installed to south well by Arrow Pump Company on 7/4/23.
Once repeats confirmed issue was at the well site; the system was flushed to get system cleared.
It was recommended to the system to ensure flushing or treating is done after any repairs done to
the system either the source, storage or distribution.
We have sampled for August and the result was confirmed negative. |
07-26-2023
|
07-26-2023
|