Deficiencies/Recommendations |
Category |
Severity |
Description Code Description Text |
Comments |
Determine Date |
Resolved Date |
DS |
MIN |
|
Entry Point to the Distribution System (EPDS) tap was not installed after pressure tank and before first service connection. |
07-13-2023
|
|
SO |
SIG |
|
No Approval of Construct (AOC) for chlorinator installed on system between 2013 and 2018. |
07-13-2023
|
|
TR |
MIN |
|
No check valve between chlorination injection point and raw water line at well. System is chlorinating into the wellhead. System needs to reconfigure the chlorine injection point down the water line and install check valve prior to chlorination. |
07-13-2023
|
|
DS |
SIG |
|
Back flow test results for the Chevron's connection was not provided. |
07-13-2023
|
|
SO |
SIG |
|
No Approval to Construct (ATC) for chlorinator installed on system between 2013 and 2018. |
07-13-2023
|
|