Deficiencies/Recommendations |
Category |
Severity |
Description Code Description Text |
Comments |
Determine Date |
Resolved Date |
SE |
MIN |
106 -Release Point
|
Verify Magnum Spring and Warm Spring are properly intact with required spring box requirements in adherence to Engineering Bulletin #10. |
12-14-2021
|
|
FW |
MIN |
|
Overflows at Magnum Tank (ST004) and Kaibab Tank #2 (ST002) need to terminate at least 12-24 inches above ground. |
12-14-2021
|
01-23-2022
|
FW |
MIN |
|
Vent line at Warm Springs tank needs to be properly screened and turned down. |
12-14-2021
|
01-23-2022
|
SE |
MIN |
|
PVC pipe vent inside pumphouse needs to be properly screened with #16 non-corrodible mesh (Warm Springs Storage tank Site). |
12-14-2021
|
01-23-2022
|
SO |
MIN |
|
Provide conditions of raw water sample taps at the source. |
12-14-2021
|
|