THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 6/29/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2014-2013, STAGE 2 INITIAL DISTRIBUTION SYSTEM EVALUATION (IDSE) 40/30 CERTIFICATION (GRANTED ON 03/31/09) AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING 2014, 2015, AND THE FIRST 2 QUARTERS OF 2016 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
01/01/2014 ¿ 06/30/2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A).
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A PR1 L1 (4120 N. WHISPERING PINES) DUAL (TTHM & HAA5)
02-A WOG L7 (5623 W. PINON DR.) DUAL (TTHM & HAA5)
BEGINNING 07/01/2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 6306 W. HARDSCRABBLE MESA RD. DUAL (TTHM & HAA5)
02-A 5272 N. RIMWOODS DRIVE DUAL (TTHM & HAA5)
|