THE STAGE 2 ROUTINE/INCREASED COMPLIANCE MONITORING PLAN, SUMMARY SHEET, AND MAP WERE APPROVED ON 06/21/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S VERY SMALL SYSTEM WAIVER, COMPLIANCE MONITORING PLAN, COMPLIANCE MONITORING PLAN SUMMARY SHEET, STAGE 1 DATA AND MAP. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) IN 2014 AND 2015 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 INDIVIDUAL SAMPLE(TTHM) AT 01-A AND 1 INDIVIDUAL SAMPLE (HAA5) AT 02-A, COLLECTED ANNUALLY, DURING THE MONTH OF SEPTEMBER.
IN SEPTEMBER OF 2015 THE SYSTEM TRIGGERED INCREASED MONITORING BEGINNING 4TH QUARTER OF 2015. INCREASED MONITORING WILL BE CONDUCTED QUARTERLY AND CONSIST OF 2 DUAL SAMPLE SETS (TTHM &HAA5) AT SITES 01-A AND 0-2A .
AS OF 06/16/2016 THE SYSTEM DOES NOT QUALIFY TO RETURN TO ROUTINE MONITORING SINCE THE LRAA EXCEEDS 3/4 OF THE TTHM MCL ¿0.060 MG/L WITH 0.061 MG/L. THE SYSTEM WILL REMAIN ON QUARTERLY SAMPLING WITH THE NEXT SAMPLES COLLECTED IN SEPTEMBER 2016.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A AVRA VALLEY RD STA 2 DUAL (TTHM & HAA5)
02-A SAMPLE STA:#19 (WRIGHT WAY STA 1) DUAL (TTHM & HAA5)
|