THE STAGE 2 ROUTINE (WITH EDITS) COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 5/23/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING AUGUST 2014 MEET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. I DO NOT SEE THE DATA FROM STAGE 2 SAMPLES COLLECTED IN AUGUST 2015.
PLEASE NOTE THAT I HAVE CORRECTED THE SAMPLING SITE IDS TO MATCH THE CORRECT LOCATIONS. THE PLAN AND THE SUMMARY SHEET ORIGINALLY SHOWED 9070-1-SE AS SITE 02-A AND 9020-1-H AS 01-A, BUT THE MAP AND THE DATA HAD THE SITES SWITCHED. THE MAP AND DATA HAD THE CORRECT SAMPLE SITE IDS PER THE RULE.
|