THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET WAS APPROVED ON 7/21/16. SO APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 DATA , 40/30, AND SUMMARY SHEET. STAGE 2 DATA SUBMITTED BEFORE THIS APPROVAL MET THE REQUIREMENTS OF THE RULE, AND WILL BE CREDITED TO THE SYSTEM.
IN 2014, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01 - A), DURING THE MONTH OF AUGUST, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 4481 CANYON DR DUAL (TTHM & HAA5)
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF AUGUST, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 2540 ZACHERY DUAL (TTHM & HAA5)
02-A 3140 LAZAR DUAL (TTHM & HAA5)
|