THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 7/22/16. SO APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S SITE PLAN, STAGE 1 DATA , MAP AND SUMMARY SHEET. THE SYSTEM DID NOT SAMPLE DBP FOR 2014 AND 2015.
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (OSBORNE MEMORIAL LAB), DURING THE MONTH OF SEPTEMBER, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01- A OSBORNE MEMORIAL LAB DUAL (TTHM & HAA5)
|