THE STAGE 2 ROUTINE SUMMARY SHEET WAS APPROVED ON 6/13/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2009, 2010, 2011, 2012, AND 2013 AND INCLUDES EDITS TO THE ATTACHED COMPLIANCE MONITORING PLAN HIGHLIGHTED IN ORANGE. STAGE 2 SAMPLES COLLECTED PRIOR TO THIS APPROVAL DURING 2014 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 2626 W. LEVIE LN (L-1) DUAL (TTHM & HAA5)
THE ATTACHED STAGE 2 REDUCED SUMMARY SHEET WAS APPROVED ON 6/13/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM JULY 2014. PLEASE, HOWEVER, CONDUCT FUTURE ANNUAL SAMPLING IN AUGUST.
BEGINNING IN 2015, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM OR HAA5), COLLECTED TRINNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF AUGUST. THE SAMPLE MUST BE COLLECTED EVERY THREE YEARS BEGINNING IN 2017 (THEN IN 2020, 2023, ETC.).
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 2626 W. LEVIE LN (L-1) DUAL (TTHM & HAA5)
|