THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN WITH MAP AND STAGE 2 ROUTINE SUMMARY SHEET WAS APPROVED ON 07/20/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013.
IN 2014, STAGE 2 MONITORING CONSISTED OF AN INDIVIDUAL SAMPLE (TTHM ONLY), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JULY, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A FIRE HYDRANT AT END OF CANDY CANE RD INDIVIDUAL TTHM ONLY
IN 2015, STAGE 2 MONITORING CONSISTED OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JULY, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A RANCH HOUSE DUAL (TTHM & HAA5)
BEGINNING IN 2016, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A RANCH HOUSE DUAL (TTHM & HAA5)
02-A YWIA OFFICE DUAL (TTHM & HAA5)
|