THE STAGE 2 REDUCED SUMMARY SHEET AND MAP WERE APPROVED ON 5/25/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FOR 2015. THE SAMPLE COLLECTED DURING 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM. THE SYSTEM HAS BEEN APPROVED TO STAY ON REDUCED MONITORING 1RT/3YR UNDER STAGE 2 STARTING 10/01/2013.
FROM 10/01/2013 ¿ 12/31/2016, STAGE 2 MONITORING CONSISTED OF INDIVIDUAL SAMPLES, COLLECTED TRIENNIALLY, AT TWO LOCATIONS, BETWEEN JUNE 1 AND SEPTEMBER 30.
BEGINNING IN 2017, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED TRIENNIALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JULY.
YOUR SYSTEM NEEDS ONE DUAL SAMPLE SET (TTHM & HAA5) TO BE TAKEN IN JULY 2018 AND EVERY THREE YEARS AFTERWARDS (JULY 2021, JULY 2024, JULY 2027, ETC.).
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR EACH SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 14550 CASTLE DUAL (TTHM & HAA5)
|