THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLANS (WITH EDITS FROM ORIGINAL SUBMITTAL) AND MAP WERE APPROVED ON 6/30/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 AND STAGE 2 MONITORING RESULTS FROM 2010-2015.
IN 2014, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST, AT:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 1717 E. LOMA VISTA DR. DUAL (TTHM & HAA5)
THE ATTACHED STAGE 2 REDUCED SUMMARY SHEET WAS APPROVED ON 6/30/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 2 MONITORING RESULTS FROM 2014 AND 2015.
BEGINNING IN 2015, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE SET, COLLECTED TRIENNIALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST. THE SAMPLE MUST BE COLLECTED EVERY THREE YEARS WITH THE NEXT SAMPLE DUE IN 2018 (THEN IN 2021, 2024, ETC.).
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THE SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A 1717 E. LOMA VISTA DR. DUAL (TTHM & HAA5)
|