THE STAGE 2 REDUCED SUMMARY SHEET AND MAP WERE APPROVED ON 6/30/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013, STAGE 2 MONITORING RESULTS FROM 2014-2015, STAGE 2 VERY SMALL SYSTEM WAIVER (GRANTED 05/08/07), AND STAGE 1 REDUCED MONITORING SCHEDULE. THE SAMPLE COLLECTED DURING AUGUST 2014 AND 2015 (PRIOR TO THIS APPROVAL) MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014-2015, STAGE 2 MONITORING WILL CONSIST OF A DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF AUGUST.
BEGINNING IN 2016, STAGE 2 REDUCED MONITORING WILL CONSIST OF A DUAL SAMPLE, COLLECTED TRIENNIALLY, AT ONE LOCATION (01-A), DURING THE MONTH OF JUNE. YOUR NEXT SAMPLE SHOULD BE TAKEN IN JUNE 2018. IF THE SYSTEM¿S POPULATION INCREASES TO SERVE 500 PEOPLE OR MORE, THEN THE MONITORING FREQUENCY WOULD AUTOMATICALLY MOVE FROM TRIENNIAL TO ANNUAL MONITORING.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE ID AND STAGE 2 COMPLIANCE MONITORING SITE ID TO ENSURE CORRECT SUBMISSION OF DWAR 32 FOR THIS SITE:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A HUGHES RESIDENCE DUAL (TTHM & HAA5)
|