THE STAGE 2 ROUTINE SUMMARY SHEET AND MAP WERE APPROVED ON 7/28/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2004-2013. STAGE 1 SAMPLING SCHEDULE. STAGE 2 DATA WILL BE CREDITED TO THE SYSTEM FOR SAMPLES COLLECTED IN 2014, 2015, AND 2016 (IF SAMPLED).
BEGINNING IN 2014, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE (TTHM & HAA5), COLLECTED ANNUALLY, AT THREE LOCATIONS (01-A, 02-A, 03-A), DURING THE MONTH OF JUNE.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A ZONE A HOWARD DUAL
02-A ZONE B SKYLINE DUAL
03-A ZONE C COCHISE DUAL
BEGINNING IN 2017, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE (TTHM & HAA5), COLLECTED ANNUALLY, AT THREE LOCATIONS (01-B, 02-B, 03-B), DURING THE MONTH OF JUNE.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-B E GRANT & 1ST ST. DUAL
02-B ALLEY & MOUNTAIN VIEW DR DUAL
03-B MOHAVE & VIEW DR DUAL
|