THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, COMPLIANCE MONITORING PLAN SUMMARY SHEET AND MAP WERE APPROVED ON 09/13/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS, THE COMPLIANCE MONITORING PLAN SUMMARY SHEET, COMPLIANCE MONITORING PLAN AND MAP. WE DID NOT RECEIVE DBP DATA FOR 2014. SAMPLES IN COLLECTED IN 2015 MET THE REQUIREMENTS OF THE RULE WILL CREDITED TO THE SYSTEM.
IN 2015, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 1 DUAL SAMPLE SET (TTHM & HAA5), COLLECTED ANNUALLY, AT ONE LOCATIONS (01-A), DURING THE MONTH OF AUGUST.
BEGINNING IN 2016, STAGE 2 ROUTINE MONITORING WILL CONSIST OF 2 DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A, 02-A), DURING THE MONTH OF AUGUST.
THE NEXT SAMPLE IS DUE TO BE TAKEN IN AUGUST 2017.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A POST OFFICE DUAL (TTHM & HAA5)
02-A 69 RANCH ROAD DUAL (TTHM & HAA5)
|