THE STAGE 2 ROUTINE COMPLIANCE MONITORING PLAN, SUMMARY SHEET AND MAP WERE APPROVED ON 6/17/16. APPROVAL WAS BASED UPON REVIEW OF THE SYSTEM¿S STAGE 1 MONITORING RESULTS FROM 2006-2013, AND STAGE 1 SAMPLING SCHEDULE. STAGE 2 SAMPLES COLLECTED (PRIOR TO THIS APPROVAL) DURING SEPTEMBER 2014 MET THE REQUIREMENTS OF THE RULE AND WILL BE CREDITED TO THE SYSTEM.
IN 2014, STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF SEPTEMBER.
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A STORE SINK CONNECTION #4 DUAL (TTHM & HAA5)
02-A WASTEWATER SINK/CONNECTION #1 DUAL (TTHM & HAA5)
BEGINNING IN 2015 (INITIAL MONITORING DATE IN 2016), STAGE 2 MONITORING WILL CONSIST OF DUAL SAMPLE SETS (TTHM & HAA5), COLLECTED ANNUALLY, AT TWO LOCATIONS (01-A AND 02-A), DURING THE MONTH OF JULY.
PLEASE BE SURE TO MARK THE CHAIN OF CUSTODY WITH THE SITE IDS AND STAGE 2 COMPLIANCE MONITORING SITE IDS TO ENSURE CORRECT SUBMISSION OF DWAR 32S FOR THESE SITES:
SITE ID STAGE 2 COMPLIANCE MONITORING SITE ID SAMPLE TYPE
01-A KITCHEN SINK IN RESTAURANT DUAL (TTHM & HAA5)
02-A TRAVEL STORE SERVICE SINK DUAL (TTHM & HAA5)
|